Capabilities

Fabrication

PIC’s fabrication team is knowledgeable, experienced and possesses strong capabilities to execute wide ranging fabrication projects for oil and gas, mining and commercial infrastructure sectors. The team is committed to high quality standards and efficiency to ensure our client’s expectations can be met and is proven by its quality management system certification to ISO 9001:2008.

Located at Kwinana Heavy Industrial area , PIC’s fabrication workshops are equipped for all type of fabrication and modularisation services. Facilities incorporate three fully equipped workshops totalling 35,000 square meters utilising 39 overhead cranes with up to 80 tonne capacity capable of handling all types of fabrication such as:

Structure Steel

  • Platework
  • Pipe spooling
  • Storage Tank
  • Pressure Vessel
  • Conveyor
  • Offshore Structure
  • Subsea Structure
News & Media
March 2015
Steel Australia: 480 Queen Street, Brisbane; Faster floors allow earlier occupancy

Steel Australia: Addressing tall order for speedier safer construction 480 Queen Street, Brisbane A steel-intensive approach has allowed an innovative parallel beam flooring system to further speed construction of the new

December 2015
Stadium Rail Project

We are pleased to announce we have secured a contract at Stadium Rail Project, Perth’s new Stadium Station complex. The agreement has been made with Laing O’Rourke and AECOM –

July 2015
Cloisters on Hay awarded as the best project of the year 2015

At Pacific Industrial Company, we are proud to have contributed to Probuild Constructions’ “Cloisters on Hay” project which secured a number of awards at the 2015 Master Builders WA –

March 2015
MZI Resources Keysbrook Mineral Sands Project

We are pleased to announce we have secured a contract at MZI Resources Keysbrook Mineral Sands Project, located approximately 70 kilometres from Perth. The agreement has been made with lead contractor

November 2014
Installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site

Pacific Industrial Company (PIC) has been engaged by Sandvik to conduct the on-site installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site. First major installations of

May 2014
BHP Billiton Iron Ore’s Mooka Ore Car Repair Shop (OCRS)

Pacific Industrial Company has been awarded the contract by lead contractor McConnell Dowell Constructors Pty Ltd.