Capabilities

Structural, Mechanical and Piping Installation

Our experienced multi-disciplined team has expertise in structural, mechanical, piping and tank construction in the delivery of oil and gas and mining projects, encompassing both Greenfield and brownfield projects.

 

Our expertise includes:

 

  • Installation of structural steel including conveyor, pipe rack and large modules
  • Installation, inspection and testing of heavy mechanical equipment such as crushers, screens, mills, compressors, pumps, agitator, overhead crane, ship loaders, stackers, reclaimers, HPGR and turbine
  • Installation, inspection and testing of large bins and tanks including thickeners, process tanks, storage bins and silos
  • Installation, inspection and testing of above and below-ground piping systems including carbon and stainless steel, HDPE and non-ferrous piping materials
  • PIC Construction equipment includes a large fleet of EWP and mobile cranes up to 350 tonne capacity
News & Media
March 2015
Steel Australia: 480 Queen Street, Brisbane; Faster floors allow earlier occupancy

Steel Australia: Addressing tall order for speedier safer construction 480 Queen Street, Brisbane A steel-intensive approach has allowed an innovative parallel beam flooring system to further speed construction of the new

December 2015
Stadium Rail Project

We are pleased to announce we have secured a contract at Stadium Rail Project, Perth’s new Stadium Station complex. The agreement has been made with Laing O’Rourke and AECOM –

July 2015
Cloisters on Hay awarded as the best project of the year 2015

At Pacific Industrial Company, we are proud to have contributed to Probuild Constructions’ “Cloisters on Hay” project which secured a number of awards at the 2015 Master Builders WA –

March 2015
MZI Resources Keysbrook Mineral Sands Project

We are pleased to announce we have secured a contract at MZI Resources Keysbrook Mineral Sands Project, located approximately 70 kilometres from Perth. The agreement has been made with lead contractor

November 2014
Installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site

Pacific Industrial Company (PIC) has been engaged by Sandvik to conduct the on-site installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site. First major installations of

May 2014
BHP Billiton Iron Ore’s Mooka Ore Car Repair Shop (OCRS)

Pacific Industrial Company has been awarded the contract by lead contractor McConnell Dowell Constructors Pty Ltd.