Projects

Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.

Works comprised of the EPC contract for the complete materials handling plant for the 128MW coal and BDT fired power station. Design requirements focussing on receival, stockpiling, reclaiming, crushing and Read More…

Multi disciplined contract for the mechanical erection of a Heat Recovery System Generator (HRSG) plant for a Combined Cycle Gas Turbine 240MW Power Station. Work scope included the on site Read More…

Works involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.

Supply, fabrication and surface treatment of Smelt Reduction Vessel (SRV), Forehearth and Stoves. Depicted is Stove assemblies 30 metres long X 9.3 metres in diameter fabricated to AS1210 pressure vessel Read More…

News & Media
March 2015
Steel Australia: 480 Queen Street, Brisbane; Faster floors allow earlier occupancy

Steel Australia: Addressing tall order for speedier safer construction 480 Queen Street, Brisbane A steel-intensive approach has allowed an innovative parallel beam flooring system to further speed construction of the new

December 2015
Stadium Rail Project

We are pleased to announce we have secured a contract at Stadium Rail Project, Perth’s new Stadium Station complex. The agreement has been made with Laing O’Rourke and AECOM –

July 2015
Cloisters on Hay awarded as the best project of the year 2015

At Pacific Industrial Company, we are proud to have contributed to Probuild Constructions’ “Cloisters on Hay” project which secured a number of awards at the 2015 Master Builders WA –

March 2015
MZI Resources Keysbrook Mineral Sands Project

We are pleased to announce we have secured a contract at MZI Resources Keysbrook Mineral Sands Project, located approximately 70 kilometres from Perth. The agreement has been made with lead contractor

November 2014
Installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site

Pacific Industrial Company (PIC) has been engaged by Sandvik to conduct the on-site installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site. First major installations of

May 2014
BHP Billiton Iron Ore’s Mooka Ore Car Repair Shop (OCRS)

Pacific Industrial Company has been awarded the contract by lead contractor McConnell Dowell Constructors Pty Ltd.