Client |
Alstom Power for Western Power |
I |
Location |
Kwinana WA |
| |
Completion |
2003 |
|
|
|
|
|
| Cockburn 1 - HRSG mechanical installation |
| Multi disciplined contract for the mechanical erection of a heat recovery system generator (HRSG) plant for a combined cycle gas turbine 240MW power station. |
| Work scope included the on site installation of steelwork, mechanical equipment, piping, pressure parts and hydro testing. Additional works included fabrication, surface treatment and erection of the 60m high × 7m diameter emission stack. |
| All on site installation, welding and testing activities were carried out in compliance with the ASME IX code and local authorities. All PIC personnel worked within very close proximity of a fully operational coal fired power station and all work was completed safely within the program budget. |
| back to projects list >> |