Client |
Monsanto Enviro-Chem Systems |
I |
Location |
Roxby Downs, Port Augusta SA -
assembly & fabrication facility
|
| |
Completion |
1997 |
|
|
|
|
 |
| Copper Uranium process plant |
| Work scope consisted of supply, fabrication, transportation and site trial assembly of stainless steel converter (184 tonnes). |
| Supply, fabrication and surface treatment of five sulphur storage tanks fully assembled, exempting one acid storage tank 25m diameter x 13m wall height, domed roof, being transported and trial assembled at the Port Augusta facility. |
| Supply, fabrication and surface treatment ex-PIC works of: one sulphur burner 4.6m diameter × 13m long, one drying tower 6m diameter × 10m long, one Ipat / fat tank 3.1m diameter × 10m long and one humidifying tower fully assembled. |
| All works were completed safely and to an accelerated completion schedule. |