Pacific Industrial Company
 
Pacific Industrial Company profile
Pacific Industrial Company safety policy
Pacific Industrial Company capabilities
Pacific Industrial Company clients and projects
Pacific Industrial Company employment
contact Pacific Industrial Company back to home page
 
  WMC Olympic Dam Expansion  
 
  Client Monsanto Enviro-Chem Systems I Location Roxby Downs, Port Augusta SA -
assembly & fabrication facility
  Completion 1997      
Copper Uranium process plant
Work scope consisted of supply, fabrication, transportation and site trial assembly of stainless steel converter (184 tonnes).
Supply, fabrication and surface treatment of five sulphur storage tanks fully assembled, exempting one acid storage tank 25m diameter x 13m wall height, domed roof, being transported and trial assembled at the Port Augusta facility.
Supply, fabrication and surface treatment ex-PIC works of: one sulphur burner 4.6m diameter × 13m long, one drying tower 6m diameter × 10m long, one Ipat / fat tank 3.1m diameter × 10m long and one humidifying tower fully assembled.
All works were completed safely and to an accelerated completion schedule.
back to projects list >>