Woodside - KJV LNG Train 4 |
|
| |
| |
Client |
Woodside |
I |
Location |
Burrup WA |
I |
Completion |
2002 |
|
|
| Three gas turbine emission stacks and thermal combustion unit |
| Supply, fabrication, surface treatment of gas turbine emission stacks (GTES), ie GTES 4007, 4008 and 1410, also thermal combustion unit. Units varied but generally were 40 metres high × 6 metres diameter in 2 pieces, 20 metres long, of bolted flange construction. |
| Work included access towers, stairways, landings, hand rails, 60 000 refractory anchors and management of refractory installation prior to shipment. Shipping weights of approximately 190 tonnes each were involved. |
| TCU combustion chamber was 100% stainless steel 316 material. Construction templates were also part of the contract for foundation bolts. |
| All works were successfully completed safely, on time and on budget. |