  BHP Billiton Area C to Yandi Railroad Project  
 
  Client Barclay Mowlem I Location Approximately 150 km North West of Mt
Newman, Pilbara WA
  Completion 2003      
Yandicoogina Creek Gorge railway bridge
Supply, fabrication, surface treatment, full assembly and load out of bridge sections for construction of a 200 metre rail bridge. Construction comprised the fabrication of 3 plate girders 45m long × 3.25m deep, with a 40mm bottom flange and a 25mm top flange and 20mm web. Web to flange incorporated full strength butt welds to AS 1554 Part 1 XP.
Load out dimensions were 45m long × 4m wide × 4m high, weighing 125 tonnes per assembly.
All work was finished on time and on budget to extremely tight tolerances and QA/QC requirements.