About Us

Our Naval Base Facility

Three major workshops with a floor area totalling 33,000 square metres.

32 overhead travelling cranes up to 80 tonne capacity.

PIC has invested extensively in the latest CNC machinery, automated plate and beam processing lines.

Our fabrication facility includes:

  •  CNC Ficep Beam Drilling and Robotic Profiling Line
  •  CNC Wagner Beam Drilling and Kaltenbach Cold Sawing Line
  •  CNC Ficep Band Sawing Line
  •  CNC Ficep Beam Drilling and Band Sawing Line
  •  CNC Ficep Angle Line (punching, shearing and marking)
  •  CNC Ficep TIPO B plate punching, drilling, profiling (Plasma/LPG) line
  •  CNC Ficep Plate Punching (Triple gag) and Drilling Line
  •  CNC Pipe profiling Line (Plasma)
  •  2 x CNC Plasma/LPG multi head plate profile cutters complete with 18    metre water beds
  •  NC 250 tonne x 3 metre Press Brake
  •  Pyramid plate rolls 30mm x 3 metre
  •  Section rolls 150 x 150 x 15.

 

Full complement of Boom Welders, rotators and manipulators. Automatic and semi-automatic SST, TIG, MIG, FCAW and SAW welding machines.

News & Media
March 2015
Steel Australia: 480 Queen Street, Brisbane; Faster floors allow earlier occupancy

Steel Australia: Addressing tall order for speedier safer construction 480 Queen Street, Brisbane A steel-intensive approach has allowed an innovative parallel beam flooring system to further speed construction of the new

December 2015
Stadium Rail Project

We are pleased to announce we have secured a contract at Stadium Rail Project, Perth’s new Stadium Station complex. The agreement has been made with Laing O’Rourke and AECOM –

July 2015
Cloisters on Hay awarded as the best project of the year 2015

At Pacific Industrial Company, we are proud to have contributed to Probuild Constructions’ “Cloisters on Hay” project which secured a number of awards at the 2015 Master Builders WA –

March 2015
MZI Resources Keysbrook Mineral Sands Project

We are pleased to announce we have secured a contract at MZI Resources Keysbrook Mineral Sands Project, located approximately 70 kilometres from Perth. The agreement has been made with lead contractor

November 2014
Installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site

Pacific Industrial Company (PIC) has been engaged by Sandvik to conduct the on-site installation of the 4700tph Fines Stacker ST03 at Rio Tinto’s West Angelas site. First major installations of

May 2014
BHP Billiton Iron Ore’s Mooka Ore Car Repair Shop (OCRS)

Pacific Industrial Company has been awarded the contract by lead contractor McConnell Dowell Constructors Pty Ltd.